
What to Expect from a Stone-Coated Metal Roof Installation in Cleveland, Ohio
Quick Answer
Stone-coated metal roof installation in Cleveland typically involves removing old materials, applying underlayment, installing interlocking Tilcor panels, and sealing edges for long-lasting protection. The process usually takes 2–4 days, depending on home size and roof complexity.
Why Cleveland Homeowners Choose Stone-Coated Metal Roofing
Cleveland’s proximity to Lake Erie means heavy snow, strong winds, and wide temperature swings, all tough on traditional asphalt shingles. Tilcor’s stone-coated metal roofs are engineered to endure these conditions with durable, interlocking steel panels that resist corrosion, leaks, and ice buildup.
According to Tilcor Roofing Systems, their panels combine the strength of ZINCALUME® steel with natural stone chips for a roof that lasts over 50 years while maintaining a beautiful, classic look.

Step-by-Step Overview of the Installation Process
1. Roof Inspection and Preparation
Installers begin with a thorough inspection of your current roof deck to identify weak areas or damage. Any rotten sheathing is replaced before installation to ensure a solid foundation.
2. Underlayment Installation
A waterproof underlayment is applied to create a moisture barrier between the deck and the new roof. Tilcor recommends a high-performance underlayment that works with their interlocking panel design to prevent leaks and condensation.
3. Panel Layout and Secure Fastening
Tilcor panels are installed starting at the eaves, overlapping each other to form a watertight seal. The interlocking system resists high winds, keeping panels secure even during Cleveland’s lake-effect storms.
4. Flashing, Edges, and Finishing Details
Professional installers then add flashing around chimneys, skylights, and roof valleys to prevent water intrusion. Ridge caps and trim pieces are carefully aligned to match the roof profile and finish the look.
5. Final Quality Check
Every Tilcor installation concludes with a detailed inspection to confirm the roof’s integrity, alignment, and weatherproofing. This step ensures the homeowner receives the full benefit of Tilcor’s industry-leading warranty coverage.
How Long Does Installation Take?
Most stone-coated metal roof installations in Cleveland take two to four days to complete. Timing depends on the roof’s size, pitch, and the complexity of flashing or valleys. Tilcor’s lightweight panels make installation faster and safer than heavy materials like slate or concrete tile.
Final Thoughts
Upgrading to a Tilcor stone-coated metal roof means choosing durability, beauty, and peace of mind for decades. Cleveland homeowners can expect a smooth, efficient process, and a roof designed to withstand Ohio’s toughest weather while enhancing your home's style and look.
For professional installation and expert craftsmanship, Great Lakes Home Remodeling proudly installs Tilcor products across Cleveland and Northeast Ohio, combining top-tier materials with award-winning service.